CLIQ™ Launches Modular Lighting System Designed for Faster, Lower-Cost Data Center Construction

Innovative CLIQ system removes lighting as a construction bottleneck by dramatically reducing labor time and operating energy in large-scale facilities

DENVER, CO, UNITED STATES, January 15, 2026 /EINPresswire.com/ — CLIQ™, a new modular lighting system developed by SHIFT Innovations, the innovation engine of 1LUX, today announced the launch of a radically simplified lighting solution designed to address one of the most persistent and overlooked challenges in modern construction: slow, labor-intensive lighting installation that hasn’t evolved in decades.

As data centers and other large-scale facilities race to come online amid skilled labor shortages, rising construction costs, and aggressive delivery schedules, CLIQ replaces traditional lighting methods with a system engineered for speed, efficiency, and self-performed installation—reducing reliance on scarce skilled labor and complex wiring.

“Material and labor costs may vary, but time pressure is constant,” said Brian Stern, CEO at 1LUX. “CLIQ was built around that reality. We designed this system to remove lighting as a bottleneck so projects can move faster, crews can work more efficiently, and facilities can operate with lower ongoing energy costs once they go online.”

Traditional lighting systems can require thousands of labor hours per data center, often involving multiple installation phases and expensive skilled labor. CLIQ’s modular, Class 2 low-voltage design installs up to ten times faster than legacy systems and transitions seamlessly from temporary to permanent lighting—eliminating redundant work and significantly compressing construction timelines.

Beyond installation speed, CLIQ reduces long-term energy consumption, helping continuously operating facilities like data centers better control operating costs. The system also simplifies logistics and reduces packaging and job-site waste, improving safety, cleanliness, and overall site efficiency.

CLIQ was developed by lighting and construction veterans with decades of hands-on experience designing, selling, and installing systems across large-scale projects. That real-world perspective shaped a product focused less on adding features—and more on eliminating construction issues in large spaces like data centers.

“The latest construction methods demand the latest, most innovative construction solutions. CLIQ Modular Lighting helps contractors and developers build smarter where speed, labor availability, and energy efficiency define success,” Stern added. “CLIQ isn’t about reinventing lighting for the sake of it. It’s about building smarter for an era where speed, labor availability, and energy efficiency define success.”

While CLIQ was designed to address the acute challenges facing data center construction, the system is also well suited for other large-scale environments including warehouses, manufacturing facilities, public storage, and large-format commercial spaces.

For more information about CLIQ, visit CLIQLighting.com.


About 1LUX

1LUX is a Denver-based lighting company delivering unexpected ingenuity across a wide range of lighting products, logistics, and project solutions. With deep roots in design, distribution, and execution, 1LUX brings together innovative products, operational efficiency, and real-world expertise to solve complex challenges across large-scale commercial, industrial, and infrastructure environments. Through its portfolio of brands and services, 1LUX focuses on simplifying systems, reducing friction, and creating measurable value for clients at every stage of a project.

About SHIFT Innovations

SHIFT Innovations is the problem-solving and product incubation division of 1LUX. Driven by design thinking and hands-on industry experience, SHIFT identifies inefficiencies that have become accepted as “the way things are” and develops new solutions that rethink how lighting and construction systems should work. SHIFT is the creative engine behind CLIQ™ Modular Lighting System and future innovations across the 1LUX portfolio.

Kate Stuard
1LUX
kate@dsjstrat.com

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

New Report Reveals Stagnation in Global Social Progress

New Report Reveals Stagnation in Global Social Progress

Social Progress Index data shows that quality of life has stalled globally since 2021 with little prospect for a recovery under populist & authoritarian leaders…

January 25, 2026

ZOZEN as a Firetube Boiler Manufacturer for Food Processing Plants: Product and Application Overview

ZOZEN as a Firetube Boiler Manufacturer for Food Processing Plants: Product and Application Overview

WUXI, JIANGSU, CHINA, January 21, 2026 /EINPresswire.com/ — For modern food processing plants, selecting the right boiler partner can determine whether production runs smoothly or…

January 25, 2026

Why Leading Chemical Companies Choose ZOZEN as a Reliable Steam Boiler Exporter With CE and EAC Certifications

Why Leading Chemical Companies Choose ZOZEN as a Reliable Steam Boiler Exporter With CE and EAC Certifications

WUXI, JIANGSU, CHINA, January 21, 2026 /EINPresswire.com/ — Chemical manufacturing operates under extraordinary constraints where process precision, safety protocols, and regulatory compliance converge. Steam boilers…

January 25, 2026

Roofing Experts Recommend Maintenance to Prevent Heat Loss During Cold Spells

Roofing Experts Recommend Maintenance to Prevent Heat Loss During Cold Spells

Cold weather across Middle Tennessee continues to expose overlooked issues in residential roofing systems. NASHVILLE, TN, UNITED STATES, January 20, 2026 /EINPresswire.com/ — Cold weather…

January 25, 2026

Industry Analyst offers comment to news media for AI, 5G, Wireless, Telecom and Technology coverage

Industry Analyst offers comment to news media for AI, 5G, Wireless, Telecom and Technology coverage

Jeff Kagan has been described as the most widely quoted analyst in the telecommunications industry “Jeff Kagan has been described as the most widely quoted…

January 25, 2026

Explore Authors Magazine releases its list of hot new books to read this February

Explore Authors Magazine releases its list of hot new books to read this February

Time for a box of Valentine’s Day chocolates and a great book from Explore Authors Magazine’s recommended list of hot new books to read this…

January 25, 2026

Grand Rapids Crane Co Highlights Role of Crane Services in Supporting West Michigan Construction and Industrial Projects

Grand Rapids Crane Co Highlights Role of Crane Services in Supporting West Michigan Construction and Industrial Projects

GRAND RAPIDS, MI – January 20, 2026 – PRESSADVANTAGE – Grand Rapids Crane Co continues to provide crane services that support the ongoing construction, manufacturing,…

January 25, 2026

Dr. Omar Marar Supports Child-Focused Global Development Through Compassion International

Dr. Omar Marar Supports Child-Focused Global Development Through Compassion International

Aligning his philanthropy with child-focused development initiatives, the Michigan physician is extending his commitment to health beyond the clinical setting. SAGINAW, MI, UNITED STATES, January…

January 25, 2026

Viva Las Vegas Rockabilly Weekend – Full Band List

Viva Las Vegas Rockabilly Weekend – Full Band List

Full list of bands playing at the 29th Viva Las Vegas Rockabilly Weekend – The Longest Running Music Festival in Las Vegas The Greatest 50’s…

January 25, 2026

Ricardo José Haddad Musi Reveals Connection Between Huichol Art and Lebanese Mosaics

Ricardo José Haddad Musi Reveals Connection Between Huichol Art and Lebanese Mosaics

Ricardo José Haddad Musi, a Mexican businessman and expert in cultural heritage, compares geometric patterns of Huichol art with Lebanese mosaics CA, UNITED STATES, January…

January 25, 2026

Author Angel Luis Colón Brings ‘POP!’ to Ruadán Books

Author Angel Luis Colón Brings ‘POP!’ to Ruadán Books

Author Angel Luis Colón Brings Noir Thriller “POP!” to Ruadán Books Angel is a master craftsman and weaves a deliciously macabre, twisted tale that readers…

January 25, 2026

San Blas Securities Launches Mergers & Acquisitions (M&A) Practice

San Blas Securities Launches Mergers & Acquisitions (M&A) Practice

Industry Veteran Christian Wolford Joins the Firm as Managing Director and Head of Mergers & Acquisitions CHICAGO, IL, UNITED STATES, January 20, 2026 /EINPresswire.com/ —…

January 25, 2026

Further Shallow High-Grade Assays Infill Tunkillia S1/2 Pits

Further Shallow High-Grade Assays Infill Tunkillia S1/2 Pits

Indications of higher-grade vertical structures shallower in system HIGHLIGHTS Final round of ‘phase 1′ Resource upgrade drill results return shallow high-grade assays in Tunkillia S1…

January 25, 2026

Nu-Ice Dry Ice Blasters Support Industrial, Non-Abrasive Cleaning Applications

Nu-Ice Dry Ice Blasters Support Industrial, Non-Abrasive Cleaning Applications

CLEVELAND, OH, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Nu-Ice Blasting manufactures dry ice blasters

January 24, 2026

Strickland Family Dentistry Welcomes Matthew Strickland, DDS, to Sarasota Practice

Strickland Family Dentistry Welcomes Matthew Strickland, DDS, to Sarasota Practice

The son of founder Dr. George Strickland joins the Sarasota practice, bringing advanced training and a patient-centered

January 24, 2026

New Book Helps Notaries Stop Underpricing and Build Sustainable, Profitable Businesses

New Book Helps Notaries Stop Underpricing and Build Sustainable, Profitable Businesses

A new book by Velita A. Faulk helps notaries and service professionals stop underpricing, prevent burnout, and build

January 24, 2026

Alliance Entertainment and Avalon Advanced Materials Interviews to Air on the RedChip Small Stocks, Big Money(TM) Show on Bloomberg TV

Alliance Entertainment and Avalon Advanced Materials Interviews to Air on the RedChip Small Stocks, Big Money(TM) Show on Bloomberg TV

ORLANDO, FLORIDA / ACCESS Newswire / January 16, 2026 / RedChip Companies will air interviews with Alliance

January 24, 2026

AMICO, a Portfolio Company of Pacific Avenue Capital Partners, Expands Metal Perforating & Fabrication Capabilities With Acquisition of Accurate Perforating Co., Inc.

AMICO, a Portfolio Company of Pacific Avenue Capital Partners, Expands Metal Perforating & Fabrication Capabilities With Acquisition of Accurate Perforating Co., Inc.

LOS ANGELES, CA / ACCESS Newswire / January 16, 2026 / Pacific Avenue's Alabama Metal Industries Corporation ("AMICO")

January 24, 2026

SMX Announces Opening of Kraken Account as Part of Board-Approved Treasury Strategy

SMX Announces Opening of Kraken Account as Part of Board-Approved Treasury Strategy

NEW YORK, NY / ACCESS Newswire / January 16, 2026 / SMX (Security Matters) PLC (NASDAQ:SMX), a global pioneer in

January 24, 2026

Influential Women Spotlights Kimberly S. Walker: A Trailblazer in Legal and Compliance Leadership

Influential Women Spotlights Kimberly S. Walker: A Trailblazer in Legal and Compliance Leadership

LOVELAND, CO, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Empowering Women and Navigating Complex Regulatory

January 24, 2026

DYNEM Mobility partners with EBOC Mobility Group to Power New B2B Electric Bike Division in the U.S.

DYNEM Mobility partners with EBOC Mobility Group to Power New B2B Electric Bike Division in the U.S.

PUNE, INDIA, January 16, 2026 /EINPresswire.com/ — DYNEM Mobility, a leading OEM partner in the electric mobility

January 24, 2026

Influential Women Profiles: Fanny Scargle, Trailblazer in Technology and Telecommunications

Influential Women Profiles: Fanny Scargle, Trailblazer in Technology and Telecommunications

BROOKSVILLE, FL, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Bilingual Sales Leader at Advantech Driving

January 24, 2026

California ChangeLawyers Launches Next Gen Scholars Program for Fall 2026 California Law Students

California ChangeLawyers Launches Next Gen Scholars Program for Fall 2026 California Law Students

LOS ANGELES, CA, UNITED STATES, January 16, 2026 /EINPresswire.com/ — California ChangeLawyers is pleased to announce

January 24, 2026

Influential Women Spotlights Lisa M. Conner: A Leader in Corporate and Securities Law

Influential Women Spotlights Lisa M. Conner: A Leader in Corporate and Securities Law

RICHMOND, VA, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Kaufman & Canoles Paralegal Brings Over a

January 24, 2026

Influential Women Recognize Taliah Hameed for Her Work as an Entrepreneur, Real Estate Investor, and Legal Secretary

Influential Women Recognize Taliah Hameed for Her Work as an Entrepreneur, Real Estate Investor, and Legal Secretary

HILLSIDE, NJ, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Integrating Legal Expertise, Property Management

January 24, 2026

CodaPet launches compassionate in-home pet euthanasia services in Palm Bay, FL, and surrounding areas.

CodaPet launches compassionate in-home pet euthanasia services in Palm Bay, FL, and surrounding areas.

The veterinarian-owned startup empowers a network of veterinarians who provide in-home euthanasia to ease the passing

January 24, 2026

Nijigen no Mori’s ‘NARUTO & BORUTO Shinobi-Zato’ Celebrates ‘Gaara’s Birthday’ in 2026

Nijigen no Mori’s ‘NARUTO & BORUTO Shinobi-Zato’ Celebrates ‘Gaara’s Birthday’ in 2026

Three Events Available for a Limited Time, January 16-19, 2026 AWAJI, JAPAN, January 16, 2026 /EINPresswire.com/ — At

January 24, 2026

PitPat Sports Club 37 Officially Launches: Pedal to Win, Riding Toward 2026 With Cyclists Worldwide

PitPat Sports Club 37 Officially Launches: Pedal to Win, Riding Toward 2026 With Cyclists Worldwide

HOUSTON, TX, UNITED STATES, January 16, 2026 /EINPresswire.com/ — As a global leader in online sports competitions,

January 24, 2026

Syssero Joins Rotation Digital to Grow Its Impact Across HR and Enterprise Technology

Syssero Joins Rotation Digital to Grow Its Impact Across HR and Enterprise Technology

Syssero, a Workday Services, Sales, and Innovation Partner has been acquired by Rotation Digital. This partnership

January 24, 2026

Metos NA and Turflogic Announce Strategic Partnership to Deliver Transformational Insights for Golf Course Management

Metos NA and Turflogic Announce Strategic Partnership to Deliver Transformational Insights for Golf Course Management

BONITA SPRINGS, FL, UNITED STATES, January 16, 2026 /EINPresswire.com/ — Metos NA, a subsidiary of Pessl Instruments,

January 24, 2026

Looper Insights Introduces Advanced Content Type & Genre Filtering to Its Merchandising Platform

Looper Insights Introduces Advanced Content Type & Genre Filtering to Its Merchandising Platform

LONDON, UNITED KINGDOM, January 16, 2026 /EINPresswire.com/ — Looper Insights, the leading CTV merchandising analytics

January 24, 2026

Dubai Claims Its Place as The Global Food Capital as Homegrown Chefs Take Centre Stage at Dubai World Cuisine By Gulfood

Dubai Claims Its Place as The Global Food Capital as Homegrown Chefs Take Centre Stage at Dubai World Cuisine By Gulfood

The world takes a seat at Dubai’s table as homegrown and globally acclaimed chefs redefine Dubai’s culinary identity as

January 24, 2026

Semper Velocity Management Accelerates Growth with 2025 Florida Relocation and Lumen Fiber+ Campaign

Semper Velocity Management Accelerates Growth with 2025 Florida Relocation and Lumen Fiber+ Campaign

Semper Velocity Management relocates to Florida, driving rapid growth and success with its Lumen Fiber+ campaign and

January 24, 2026

DreamFi and Ben Crump Law Announce Community-Focused Partnership with National Baptist Convention USA, Inc.

DreamFi and Ben Crump Law Announce Community-Focused Partnership with National Baptist Convention USA, Inc.

The partnership reflects a shared commitment to strengthening communities through financial education, stewardship, and

January 24, 2026

CRSTL Radio to Launch Feb 1, 2026 from Lindenwood Park Place Social Club

CRSTL Radio to Launch Feb 1, 2026 from Lindenwood Park Place Social Club

CRSTL, a volunteer-run internet radio station founded by former KDHX DJs, launches from Lindenwood Park Place, a

January 24, 2026

HiBFF Announces Launch of V2.0 AI Companionship Platform with Integrated Ethical Safety Architecture

HiBFF Announces Launch of V2.0 AI Companionship Platform with Integrated Ethical Safety Architecture

HiBFF announced the deployment of HiBFF V2.0, an artificial intelligence companionship platform developed to address

January 24, 2026

Peer To Peer Network (OTC:PTOP) Reports Productive Turnout for Open Shareholder Conference Call, Outlines 2026 Growth Roadmap

Peer To Peer Network (OTC:PTOP) Reports Productive Turnout for Open Shareholder Conference Call, Outlines 2026 Growth Roadmap

CAMBRIDGE, MASSACHUSETTS / ACCESS Newswire / January 16, 2026 / Peer To Peer Network, Inc. (OTC:PTOP), the original

January 24, 2026

GameSquare to Present at the Sequire Investor Summit on January 20-22, 2026

GameSquare to Present at the Sequire Investor Summit on January 20-22, 2026

FRISCO, TEXAS / ACCESS Newswire / January 16, 2026 / GameSquare Holdings, Inc. ("GameSquare" or the "Company")

January 24, 2026

Polygon Research Expands Loan-Level Non-QM Market Analysis in HMDAVision®

Polygon Research Expands Loan-Level Non-QM Market Analysis in HMDAVision®

The January 2026 update enables examination of Non-Qualified Mortgage activity at the loan level across seven years of

January 24, 2026

Suberu Luxury Launches Exclusive Strategic Seller Consultation to Help Boston’s Suburban Luxury Sellers Prepare for 2026

Suberu Luxury Launches Exclusive Strategic Seller Consultation to Help Boston’s Suburban Luxury Sellers Prepare for 2026

New consultation focuses on pricing, timing, digital strategy, and market positioning for 2026 home sales Luxury

January 24, 2026